Why we charge for Discovery
A free quote prices work nobody has defined yet. This is what a paid Discovery phase produces, what stays free on our side, when a free quote is fine, and five questions to put to the quote you already hold.

Contents8 sections
A free quote prices work nobody has defined
You have a product to build and three vendors on your list. Two send a number within the week, free. The third wants to be paid before it will give you one, and on the day you compare them it looks like the expensive option.
The comparison changes once the work starts. A number produced from one conversation rests on things nobody has checked: what the other systems really expose, which rules live only in someone’s head, what your data actually looks like. When one of those turns out differently, the gap comes back to you as a change request. You pay for the guess after all, just later, when you are too far in to walk away.
What Discovery does. It defines the work first, in a written specification, a clickable prototype, a technical architecture and a module by module estimate. That estimate becomes the fixed price, and you approve it before development starts. The length is scoped and dated before you pay for it.
What is inside a free quote
A free quote is a sales document. The person writing it has a few hours, one call’s worth of notes and at least one competitor to beat. Those conditions push the number in one direction: a careful estimate with room for the unknowns comes in high and loses, and an optimistic one wins, with the difference sorted out later. Nobody has to be dishonest for this to happen. An estimator who refuses to play along simply stops winning work.
The guess is usually written down, too. Look at the assumptions section of any quote you have been sent. “Client will provide API access.” “Data will be supplied in a clean format.” “Up to two rounds of revisions.” Each of those lines marks a place where the price stops holding, so every assumption in a quote is a change request that has not been dated yet.
A change request is where you pay for the guess
Some change requests are fair. You saw the product, learned something and changed your mind, and that should cost something. The ones to watch are requests for work that was always needed and was never in the number. By the time they arrive, you have little choice but to accept them, because switching means paying someone else to learn the code and the date you promised internally does not move.
So a free quote has two costs. One is the money, and the other is timing: the argument over scope now happens after you have lost the option to leave. The only moment you had real leverage was before you signed, and the quote gave you nothing to use it with.
What Discovery produces
Discovery is a paid phase, billed weekly and usually one to two weeks long, in which a business analyst and a senior engineer define requirements, assess feasibility and prepare the estimate. Six things come out of it.
Requirements with user stories. The written version of what the product must do, and something both sides can check the build against.
People disagree about a screen they can click long before they disagree about a paragraph. Moving a button here costs far less than moving it after it has been built.
What gets built on what, and how it connects to the systems you already run. A senior engineer finds out here whether the hard part is really hard.
The decisions and answers from the phase, kept in a form the team can search.
What ships first and what waits, so scope can be cut by phase.
The cost broken down by module, so you can see where it goes and cut something before it is built. This estimate becomes the fixed price for the build.
Ask for the documents to be yours. A free quote leaves you holding a number, and Discovery should leave you holding a specification another vendor can price against. Ask any vendor, us included, to put in writing that you keep what the phase produces whether or not you continue, and read that clause before you sign.
Know the scope before you pay for the build
Bring the quote you already hold, its assumptions section and the systems the product has to connect to. In 30 minutes we tell you which assumptions we would test first.
What this looked like at HeartMed
HeartMed provides bedside cardiac monitoring to patients across 50+ nursing homes. Its CEO described the problem on the first discovery call:
On a good month we’re losing about $100,000. On a bad month, anywhere close to half a million to a million dollars a month, because we’re missing codes, missing patients, things aren’t being tracked properly.
That call made the size of the problem clear, and it could not have produced a fair price for a build. Complexity assessments were being made subjectively by floor staff from face sheets, so the rules a system would have to encode did not yet exist in a form anyone could code.
The engagement opened with a structured Business Analysis: mapping the workflow, then encoding all seven CPT slot rules across four complexity tiers. It also delivered a hardened Excel file as interim relief within two weeks. That foundation became a standalone web application, and the case study estimates $200K or more a month in revenue was at stake before it. The full story is in the HeartMed case study.
What stays free
You will see “Get a Free Quote” on our own site, and our audits, consultations and quotes are free. The two positions fit together because each step answers a different question.
| Step | What it costs | What you get |
|---|---|---|
| Technical audit, for an existing product | Free | A scored review across seven areas and a written findings report with severity levels, in one to five days |
| Scoping call, for a new product | Free | A conversation about what you want to build |
| Embedded engineers | Free quote, by role and hours | Senior engineers working inside your team |
| Discovery | Paid, billed weekly | Requirements, prototype, architecture, roadmap and a module by module estimate |
| The build | The fixed price you approved | The product described in the estimate, with development starting after your approval |
A quote for engineers by role and hours has no scope guess inside it. A fixed price on a product does, unless someone has done the work to remove it, and on a build with us that work is Discovery. Our Software Development page sets out the rest of the model.
When a free quote is fine
- You are buying capacity. Engineers by role and hours can be priced without knowing how the product will turn out.
- The job is small and already specified. If a competent engineer can read a finished spec and price it in an afternoon, there may be little left to discover.
- You only need a budget sanity check. A rough number helps you decide whether to go further, as long as everyone keeps calling it rough.
The trouble starts when a rough number gets treated as a commitment by either side.
Five questions for the quote you already have
- Which assumptions does this number rest on, and has anyone checked them?
- What happens to the price if one of them turns out to be wrong?
- Who wrote the estimate, and will that person be on the build?
- Is it broken down by module, or is it one number?
- How are changes priced after we sign?
Put them to any vendor, including us. For a build you plan to start soon, begin with a free technical audit of your existing product or a scoping call for a new one, and you will know the scope and the cost before anyone writes a line of production code.
Service details come from the Touch Support Software Development page. HeartMed details and the quote are as published. The quote assumptions are illustrations, not client findings.
Questions
Short answers. Anything else, ask us on a call.
How long does Discovery take?
Usually one to two weeks, depending on the product. The length is agreed and dated before you pay for it. Ask any vendor for that date in writing before you start.
What does Discovery cost?
It is billed weekly, and the figure is a conversation for a call. We do not publish rates.
Can we take the Discovery documents to another vendor?
That is what you should ask for. Get it in writing that you keep the documents whether or not you continue with the vendor that wrote them, and read the clause before you sign. A specification another vendor can price against is the point of paying for the phase.
Does a fixed price mean we cannot change anything?
Scope can still change, because you will learn things during a build. The fixed price is tied to the estimate you approved, so you can see what changed against it. Ask any vendor, us included, how those changes get priced before you sign.
Does the free technical audit replace Discovery?
No. They do different jobs. The audit reviews a product you already have, and Discovery defines a product you want built.
Get a team that already does this.
Embedded CX, IT, finance and software teams, live in about 7 days. Start with a 30-minute call.